RESEARCH / DISCOVERY
← Back to the library

Irritable bowel syndrome and Parkinson's disease risk: register-based studies.

Irritable bowel syndrome and Parkinson's disease risk: register-based studies.

Read the original publication

Where did the research take place?

The study site has not been established. Author addresses may differ from where the research occurred.

Stockholm, SE · Author affiliation

Department of Medical Epidemiology and Biostatistics, Karolinska Institutet, Stockholm, Sweden. bojing.liu@ki.se.
Location evidence

Los Angeles, US · Author affiliation

Department of Psychology, University of Southern California, Los Angeles, CA, USA.
Location evidence

Örebro, SE · Author affiliation

Department of Paediatrics, Örebro University Hospital, Örebro, Sweden.
Location evidence

Nottingham, GB · Author affiliation

Division of Epidemiology and Public Health, School of Medicine, University of Nottingham, Nottingham, UK.
Location evidence

New York City, US · Author affiliation

Celiac Disease Center, Department of Medicine, Columbia University College of Physicians and Surgeons, New York, NY, USA.
Location evidence

East Lansing, US · Author affiliation

Department of Epidemiology and Biostatistics, College of Human Medicine, Michigan State University, East Lansing, MI, USA.
Location evidence

Explore research worldwide

A plain-language reading has not been prepared for this paper yet.

Original abstract

To examine whether irritable bowel syndrome (IBS) was related to the future risk of Parkinson's disease (PD), we conducted a nested case-control study in the Swedish total population including 56,564 PD cases identified from the Swedish Patient Register and 30 controls per case individually matched by sex and year of birth. Odds ratios (ORs) with 95% confidence intervals (CIs) for having a prior diagnosis of IBS were estimated using conditional logistic regression. We furthermore conducted a cohort study using the Swedish Twin Registry following 3046 IBS patients identified by self-reported abdominal symptoms and 41,179 non-IBS individuals. Through Cox proportional hazard models, we estimated hazard ratios (HRs) and 95% CIs for PD risk. In the nested case-control study, 253 (0.4%) PD cases and 5204 (0.3%) controls had a previous IBS diagnosis. IBS diagnosis was associated with a 44% higher risk of PD (OR = 1.44, 95% CI 1.27-1.63). Temporal relationship analyses showed 53% and 38% increased risk of PD more than 5 and 10 years after IBS diagnosis, respectively. In the cohort analysis based on the Swedish Twin Registry, there was no statistically significantly increased risk of PD related to IBS (HR = 1.25, 95% CI = 0.87-1.81). Our results suggest a higher risk of PD diagnosis after IBS. These results provide additional evidence supporting the importance of the gut-brain axis in PD.

Explore another example or bring your own paper

Pasted text and PDF extraction stay on this computer. The local guide explains terms and surfaces passages; rewriting requires a configured local model. Scanned PDFs need OCR first.

RECORD & PROVENANCE